The building consists of a steel frame (for quick erection) and masonry exterior walls, concrete floor slabs, and acoustical ceilings in most areas. ZMM's services included the integration of process piping into the building's HVAC systems (for energy recovery and conservation) and provisions for process/assembly line utility services (power, process water, and ventilation).
Due to the success of the first phase of the project, ZMM assisted NGK-NTK with additional growth at their campus in Sissonville, completing a second phase of their master plan.